MACHINE BUILDING
Machine Building Cables & Cable Assemblies
Machine wiring starts in the control panel and runs along the frame to valves, sensors and drives. Then come module connections and whole-machine commissioning. KABASI supplies industrial cables for these stages and builds point-to-point cable assemblies and multi-branch wire harnesses from machine drawings.
Start with the build stage and machine area. Then confirm the circuit function, motion, panel wire specification and connection details on the drawing.
See the Machine Build Stages Compare Supply and Assembly Routes
Five Build Stages in Machine Manufacturing
Follow the build sequence. A fixed connection inside the cabinet, a run along the frame and a link across a module boundary can need different cable constructions even when they carry the same signal.

Stage 1 - Control Panel Build
Wire the back panel, terminal strips, auxiliary circuits and machine interfaces before mounting the cabinet on the frame.
Cable Decision
Core count · Shielded or unshielded · Panel wire standard · Cabinet-to-cabinet links
Current Product Path
YSLY / YSLCY / YSLYCY control cables · UL Style or European Harmonized panel wire

Stage 2 - In-Machine Wiring
Run cables from the cabinet along the frame to motors, valves, sensors, switches and junction boxes. This is where route length, bundling, branches and markings take shape.
Cable Decision
Route length · Branch points · Power and signal separation · Marking · Fixed or flexible routing
Current Product Path
LiYCY / LiYY / LiYY-TP signal cables · YSLY control cable · Multi-branch wire harness

Stage 3 - Module Interconnection
Define the connection between the base unit and each add-on station. Accessible disconnects support transport, commissioning and later machine variants.
Cable Decision
Boundary connector · Pinout · Service loop · Shipping split point
Current Product Path
Point-to-point cable assembly · Control and signal cable · Module interface harness

Stage 4 - Moving Machine Sections
A gantry, slide, lifter, tool head or indexing table needs cable that can follow the full motion of the machine.
Cable Decision
Continuous or occasional flex · Bend radius · Travel · Acceleration · Carrier type
Current Product Path
TRVV moderate-flex drag chain cable · TRVU highly-flex drag chain cable · Project-specified industrial Ethernet cable documented for the moving link

Stage 5 - Machine Network and Commissioning
Link the controllers, drives, remote I/O and HMI before running the machine as a whole. Check network segments that cross module boundaries or move with an axis.
Cable Decision
Protocol · Topology · Cable category · Segment length · Moving links
Current Product Range
PROFINET Type A, B, C and R · EtherCAT · CAN Bus · CC-Link · DeviceNet · PROFIBUS · RS485
Cable Supply, Point-to-Point Assembly or Multi-Branch Harness
The same machine can use all three routes. Decide who cuts and terminates the cable, how many endpoints the run serves and how much the drawing already defines.

Industrial Cable Supply
For machine builders that cut, strip and terminate in-house and need base cable supplied by the reel in a consistent construction.
Machine Building Scenario
A standard machine model built in batches, with internal wiring made on the customer's own line.

Point-to-Point Cable Assembly
For one defined link between two endpoints, with the base cable, finished length, pinout and terminations specified.
Machine Building Scenario
Panel terminal to a junction box on the frame · Drive to motor · Operator panel to cabinet · Network patch between modules

Multi-Branch Wire Harness
For a route that serves multiple endpoints, with defined branches, breakouts, markings and a connection matrix.
Machine Building Scenario
A main run that branches to valve manifolds, sensor groups and station boxes · A cabinet harness feeding several actuators · A module interface harness terminating at the boundary
| Decision Point | Cable Supply | Point-to-Point Assembly | Multi-Branch Harness |
|---|---|---|---|
| Cutting and termination | Customer | KABASI | KABASI |
| Drawing information | Cable construction | Two endpoints, length and pinout | Connection matrix, branch points and marking |
| Where it fits | Material supply at any stage | Panel-to-device links, drive-to-motor links and module patches | In-machine branching, cabinet distribution and module interfaces |
| Routing changes | Customer adapts the routing during installation | Review the length, pinout or end terminations affected by the change | Review branch geometry, labels or the connection matrix |
Cable Selection by Machine Area
Machine areas differ in movement, available routing space and the devices they reach. Start with the area, then confirm the electrical details.
Control Cabinet
Control CablesTypical Connections
Auxiliary circuits, terminals and cabinet-to-cabinet links
Points to Confirm
Voltage, core count, shielding and panel wire standard
Current Product Examples
YSLY / YSLCY / YSLYCY
Fixed Frame Routing
Signal CablesTypical Connections
Motors, valves, sensors and junction boxes
Points to Confirm
Route length, branch points and power/signal separation
Current Product Examples
YSLY · LiYCY · LiYY
Multi-Endpoint Branches
Typical Connections
Valve manifolds, sensor groups and station boxes
Points to Confirm
Branch points, marking and connection matrix
Current Product Examples
Multi-branch wire harness
Moving Sections
Drag Chain CablesTypical Connections
Gantries, slides, lifters, tool heads and indexing tables
Points to Confirm
Bend radius, travel, acceleration and carrier type
Current Product Examples
TRVV · TRVU
Module Boundaries
Typical Connections
Base unit to add-on station
Points to Confirm
Boundary connector, pinout and shipping split point
Current Product Examples
Point-to-point assembly · Interface harness
Machine Network
Typical Connections
PLC, drives, remote I/O and HMI
Points to Confirm
Protocol, topology, segment length and moving links
Current Product Examples
PROFINET Type A/B/C/R · EtherCAT · Fieldbus
When Requirements Overlap
- Movement - For moving links, verify the cable's documented motion rating and carrier requirements.
- Protocol - Match the network protocol and cable designation before comparing network options.
- Interference - Plan physical separation from drive and power wiring. Review shielding and termination with the equipment design.
- Panel standard - Follow the destination requirements and the customer's drawing for cabinet wire.
- Delivery route - Choose base cable or finished assembly after the connection requirements are defined.

What Decides Machine Wiring and Module Interconnection
Separate Power and Signal Routes
Plan separate ducts or compartments for motor, heater and drive power feeds and for signal or network wiring. If space is limited, confirm the separation and shielding requirements along the route, including where the cables enter and leave.
Define the Shield Termination
Show whether the shield terminates at one end or both ends and where it lands, such as a PE rail, gland or connector shell. Match the termination to the equipment and EMC design.
Check the Cable Against the Carrier Radius
Compare the carrier's actual bend radius with the cable's documented dynamic bend radius. Review flex pattern, travel and acceleration for the full stroke.
Mark the Shipping Split at Each Module Boundary
Specify the connector, terminal block or service loop at each transport split. Mark the split on the drawing so the harness aligns with the machine frame.
Match the Panel Wire Specification
Use the UL AWM Style or European harmonized designation required by the drawing and destination market. Where UL recognition is specified, verify it for the exact manufacturer and construction supplied.

Match the AWM Style on the drawing.
UL Style Cables
Confirm the specified H-code and cord construction.
European Harmonized CablesMatch Labels to the Connection List
Specify wire numbers, sleeve text and label positions on the drawing. Cross-check them against the cabinet terminal numbers before commissioning.

What the Drawing Must Define for Build-to-Drawing Assembly
An electrical schematic and a connection list can start the review. Confirm the dimensions, terminations, branches and labels below before releasing an assembly or harness build.
Source and destination devices, terminal numbers, signal type and wire numbers
Construction, conductor size, core or pair count, shield and jacket material
Finished length and the reference points used to measure it
Terminal, ferrule, connector, pinout and stripping requirement
Branch point position, breakout length and protection at the split
Wire numbers, sleeve or label text, orientation and reading direction
Harnesses assigned to each module and separation points for shipping
Drawing version, change record and the revision cutoff for production
For multi-branch projects, see Custom Wire Harness.
Is a Cable Brand Fixed on the Machine Drawing?
When the drawing or BOM specifies a manufacturer or product family, check the brand category before confirming the product and documents. Brand names are used solely to identify customer-specified cable.
Machine Building Cable FAQs
How does machine internal wiring differ from control panel wiring?
Panel wiring stays on a fixed back panel inside the cabinet. Machine wiring leaves the cabinet and follows the frame to devices, some of which move. Check the destination and drawing for panel wire requirements, then assess routing, motion and the environment for the runs outside the cabinet.
How is a harness handled when the machine ships in separate modules?
Mark each transport split on the drawing. A connector or a defined terminal block lets the installer reconnect the separately marked harness sections on site. Where the design calls for field termination, specify a service loop and the length needed for it.
Can power and signal cables share one cable duct or carrier?
Use separate ducts or compartments where space permits. If the layout requires a shared route, check the equipment's EMC and installation requirements for shielding and separation. Include the entry and exit points when reviewing the layout.
Can a PROFINET or EtherCAT cable be used in a moving machine section?
Yes, when the exact cable is documented for the required movement. Confirm the protocol and designation, then check bend radius, travel, acceleration and carrier use in the product documentation.
Can you start with a wiring table and no harness drawing?
A connection list can start the review if it specifies endpoints, wire numbers, cable type, length reference points and terminations. Confirm branch geometry and marking before releasing a build.
How do I choose between TRVV and TRVU for a moving machine section?
Use the motion requirements to narrow the choice. Review TRVV for moderate-flex applications and TRVU for higher-flex duty. Verify the chosen cable's documentation against the actual carrier radius, travel, acceleration and duty cycle.
Send the Machine Drawing or the Connection List
Send the drawing or BOM with the build stage, machine area, connected devices, movement and finished connection needed. For harness projects, include the connection list and the module split points. KABASI can review the cable category and supply or assembly route.