CABLE ASSEMBLY MANUFACTURING FOR INDUSTRIAL OEM PROJECTS

Cable Assembly Manufacturing from Drawing to Volume Production

KABASI manufactures point-to-point cable assemblies and multi-branch wire harnesses for industrial equipment and OEM projects. We coordinate approved cable and component sourcing, build-to-print assembly, tooling and electrical verification through one controlled project workflow. Send your latest drawing, wire list, BOM or reference sample for review.

 
Operator performing controlled terminal crimping for industrial cable assembly production

 

3,200+ m²
Manufacturing facility
 
50+
Employees
 
20+
Production machines
 
100%
Continuity verification

02 / CHOOSE YOUR BUILD

Point-to-Point Cable Assemblies or Multi-Branch Wire Harnesses

Industrial cable assemblies do not all use the same drawing, equipment or test logic. Select the wire and cable assembly path that matches the physical topology of your product. This prevents a single-cable inquiry from being mixed with a branched harness project.

Custom Cable Assembly

Custom Cable Assembly

One cable · Two endpoints · Point-to-point assembly

Choose this path when your project needs one cable with a defined termination at each end. The build is controlled by cable type, finished length, pin assignment, connector orientation and required electrical verification.

Custom Wire Harness

Custom Wire Harness

Multiple wires · Branched paths · Multiple endpoints

Choose this path when your project needs multiple wires routed across branches and endpoints. The build is controlled by the harness drawing, wire list, branch lengths, breakout positions and required matrix verification.

03 / CAPABILITY MATRIX

What We Can Build - Capability Limits at a Glance

Use this matrix for an initial fit check. The approved drawing, selected materials, connector construction and required tests take priority over the typical ranges below.

Capability Typical working range Release rule
Conductor size 0.14–6.0 mm² standard; 6–16 mm² reviewed by application Confirm tooling, terminal and test current
Finished length 0.1–20 m standard; longer assemblies on review Drawing reference points and tolerance take priority
Termination Crimping, soldering, IDC, terminal block, field-wireable and overmolded options Connector and conductor compatibility must be confirmed
Connector interfaces Industrial circular connectors, D-sub, RJ45, terminals, housings, terminal blocks and customer-specified parts Product approvals apply only to the exact part number
Cable and insulation Bare or tinned copper; PVC, XLPE, silicone or PTFE insulated wire Availability and MOQ checked during quotation
Jacket PVC, PUR, TPE or silicone-jacketed cable Selected against temperature, flexing, oil and abrasion
Shielding Braid, foil, combined shield and drain-wire options Grounding strategy must be defined
Protection Heat-shrink, sleeving, conduit, tape, ties, clips, potting or overmolding when specified Environmental claim requires agreed test conditions
Build input Drawing, wire list, BOM, pinout, approved sample or dimensioned photo Missing information returned as DFM questions

Need something outside this range? Upload the drawing and required tests for an engineering review.

04 / ENGINEERING REVIEW

How We Review Your Drawing, BOM or Sample

Start with the latest information available for your project, including a drawing, BOM, wire list, pinout, specification, approved sample or dimensioned photo.

 

KABASI reviews the submitted information to identify missing dimensions, connection definitions, material requirements, tooling needs and test requirements. Open technical points are returned as DFM questions before the quotation and production scope are confirmed.

 

05 / APPLICATION EXAMPLES

Custom Assemblies for Demanding Applications

From wet agricultural equipment to subsea and underground systems, each assembly was built around specific operating, connection and verification requirements.

waterproof multi-branch wire harness for automated farming equipment

Waterproof Harness for Farming Equipment

Wet Environments · Multi-Branch Harness

Built for automated farming equipment exposed to wet conditions, this harness combines sealed connector interfaces with controlled branch routing and project-approved materials.

 
subsea hybrid fiber-optic and electrical cable assembly with sealed metal connector

Hybrid Cable Assembly for Subsea Equipment

Subsea Exploration · Up to 1,000 m

Built to carry optical signals and electrical power at water depths of up to 1,000 meters, this hybrid assembly uses longitudinal water blocking, protected fiber routing and a sealed metal interface.

 
160-meter multi-node signal harness for underground mineral exploration instruments

Multi-Node Harness for Exploration Equipment

Underground Exploration · 160 m Harness

Built for exploration instruments deployed 100–200 meters underground, this 160-meter harness provides 32 sealed connection nodes positioned at 5-meter intervals.

06 / MANUFACTURING PROCESS

From Cable Preparation to Final Assembly

 

The approved drawing, materials and work instructions define which steps your build requires.

automatic-wire-cutting-and-stripping-machine-stripped-conductor-ends

01 / PREPARATION

Wire and Cable Preparation

We cut and strip cable to the drawing and prepare conductors and shields as specified.

operator-crimping-terminal-onto-wire-crimped-uncrimped

02 / TERMINATION

Crimping and Terminal Assembly

We match terminals, conductor sizes and applicators to the approved crimp design.

soldered-connector-contacts-on-cable-end-with-fume-extraction

03 / SUB-ASSEMBLY

Soldering, IDC and Sub-Assembly

We assemble soldered contacts, IDC interfaces, housings and seals to the connector specification.

potting-compound-applied-to-sealed-connector-backshell

04 / PROTECTION

Sealing and Protection

We apply heat-shrink, grommets or potting where the build calls for extra protection.

vertical-overmolding-machine-connector-mold-open-cavity

05 / OVERMOLDING

Connector Overmolding

We use project-specific tooling to mold strain relief and control the cable-to-connector transition.

heat-shrink-label-printer-wire-markers-labelled-cable-end

06 / FINAL ASSEMBLY

Identification and Final Assembly

We add labels and routing hardware to the approved layout before inspection and electrical testing.

07 / BUILD TO PRINT

Clear Responsibilities from Approval to Production

Build-to-print production starts with an approved drawing, BOM, pinout and acceptance requirements. KABASI turns these inputs into controlled materials, work instructions, tooling, inspection and repeat-production records. You approve the product design, specified components, first article and engineering changes.

KABASI Handles You Provide or Approve
Review drawings, BOMs, wire lists, pinouts and reference samples Latest controlled drawing or equivalent technical package
Identify termination, shielding, sealing, tooling and testability issues Electrical function, interface definition and design intent
Source and prepare approved production materials Specified part numbers, compliance requirements and approved alternatives
Build, identify and protect the assembly to approved instructions Dimensions, tolerances, pin assignment, grounding and labeling rules
Prepare quoted fixtures, tooling, molds and test programs Quantity, schedule, packaging and acceptance requirements
Submit the first article and agreed inspection records First-article approval or documented changes
Control repeat production to the approved revision Formal engineering changes and updated acceptance criteria

 

Approved Material Sources

Projects may use KABASI-supplied, customer-supplied or mixed materials. Customer-specified cables and connectors are accepted, and any proposed alternative is submitted for approval before it enters the production BOM.

 

Setup, Scrap and Rework

The quotation can include material allowances for setup, sampling, destructive tests and tooling trials. Rework caused by manufacturing is handled separately from design changes, incorrect project data or defective customer-supplied materials.

 

Revision Control

Production follows the approved document revision. Changes to cable, connectors, pinouts, dimensions, protection, labels or acceptance requirements are reviewed before production documents are updated.

08 / PROJECT PLANNING

Prototype, MOQ and Production Lead Time

Use the ranges below for initial project planning. Final MOQ and lead time are confirmed after the BOM, material availability, assembly complexity, tooling and documentation requirements have been reviewed.

Project stage Typical Planning Range
Feasibility review Target 1–2 working days when documents are complete
Engineering prototypes 1–5 pieces or sets
Standard production MOQ From 2 pieces or sets for most custom projects
Pilot build Commonly 20–200 pieces or sets
Repeat release Up to approximately 5,000 pieces or sets per release, subject to complexity and materials
Standard Sample 7–10 working days after document and material confirmation
Overmolded or Custom-Tooled Sample 15–25 working days
Standard production lead time 15–20 working days after first-article approval
Repeat production Commonly 10–15 working days with a stable BOM and available materials

The confirmed quotation will reflect material availability, termination count, required tooling, testing scope, documentation and release quantity.

Ready to Confirm Your Project Plan?

 Send your drawing, quantity and target date for a project-specific review.

09 / QUALITY & FACTORY RESOURCES

Factory Resources for Controlled Production and Release

FAQ

Q: What Information Should I Submit For A Project Review?

A: Send the latest drawing, BOM, wire list, pinout, specification or reference sample available. Include the estimated quantity, operating conditions, required tests and target date. We will return any missing technical points for confirmation.

Q: Can You Start From A Sample Or An Incomplete Drawing?

A: Yes. A reference sample, wire list, pinout or dimensioned photo can start the review. Before production, the materials, dimensions, connections, identification and acceptance requirements must be documented and approved.

Q: Can We Specify Our Own Cable And Connectors?

A: Yes. We accept customer-specified cables, connectors and other components. If availability, MOQ or lead time becomes a concern, proposed alternatives are submitted for approval before they enter the production BOM.

Q: Can You Support Prototypes, Pilot Builds And Repeat Orders?

A: Yes. We support engineering prototypes, pilot builds and repeat production. The appropriate build stage is confirmed after the technical package, material availability, tooling and inspection requirements have been reviewed.

Q: How Are Completed Assemblies Verified Before Release?

A: Completed assemblies are checked against the approved connection definition for continuity, shorts and incorrect pin placement. Workmanship and dimensions are also inspected, with additional project tests performed when specified.

Q: Can You Work To IPC/WHMA-A-620 Requirements?

A: Yes, when the applicable revision, product class and acceptance criteria are defined in the approved project documents. Inspection is performed against those agreed requirements; this does not represent IPC certification or certified-operator status.

Q: Can You Provide First-Article And Lot-Linked Records?

A: Yes. First-article, inspection and lot-linked records can be provided when the required record type, acceptance criteria and documentation scope are agreed during quotation.

Q: How Do You Protect Our Drawings And Project Information?

A: Submitted files are used only to review and manufacture the requested project. Customer names, drawings, BOMs and proprietary part information are handled as project-controlled information. Add any NDA or file-handling requirements to your inquiry.

PROJECT INQUIRY

Start Your Cable Assembly Project

Send the latest drawing, BOM, wire list, pinout, specification or reference sample available. Include the estimated quantity, operating environment, required tests and target date. We will review the information and return any technical questions needed to prepare the quotation.

Submitted files are used only to review and support the requested project. Add any NDA or file-handling requirements to your inquiry.