01 / BUILD DEFINITION
Point-to-Point Cable Assemblies Built to Your Drawing
KABASI manufactures point-to-point cable assemblies for industrial equipment and OEM systems. Each assembly uses one specified cable with a defined termination at each end, with length, shielding, protection and identification controlled to the approved drawing, pinout, specification or reference sample.

|
1–5 Piece prototypes |
10 pieces Standard production MOQ |
7–10 days Typical samples · working days |
15–20 days Typical production · working days |
Typical planning ranges. Final MOQ and lead time are confirmed after material availability, tooling and test requirements are reviewed.
02 / DEFINE THE BUILD
Six Variables That Define Your Cable Assembly
A point-to-point cable assembly is defined by its cable construction, finished length, end A and end B interfaces, pin assignment, shield treatment, protection and identification. Add these details to the drawing or specification. Any open technical points are returned as DFM questions before quotation or first-article production.

1.Cable Construction
Define the conductor size, core count, insulation, jacket, shielding and applicable cable standard. We can use approved cable, customer-specified part numbers or approved alternatives.
Typical options: Bare or tinned copper · PVC / XLPE / silicone / PTFE insulation · PVC / PUR / TPE / silicone jacket

2. Finished Length & Tolerance
Define the finished length, measurement reference points and allowable tolerance. The approved drawing controls production, and any missing tolerance is returned for confirmation before quotation or first-article production.

3. End A & End B Terminations
Specify the connector or termination at each end, including part numbers, contact type, pin assignment, orientation, seals and accessories. Crimped, soldered, IDC, terminal-block, field-wireable or overmolded constructions are reviewed against the selected cable and production requirements.

4.Shield Termination
Define whether the braid, foil and drain wire are bonded at one end, both ends, to a connector shell or kept isolated. The approved grounding strategy determines the required shield treatment.

5.Protection and Strain Relief
Specify heat-shrink, braided sleeving, conduit, boots, glands or molded strain relief where required. The selection is reviewed against bend radius, abrasion, oil, moisture and available installation space.

6.Marking and Orientation
Define endpoint labels, heat-shrink markers, cable text, lot or serial identification and connector orientation marks. Clear identification supports installation, inspection and repeat production.
03 / WORKING RANGE
Typical Build Range for Point-to-Point Assemblies
Use these ranges for an initial fit check. The approved drawing, selected cable, connector compatibility and required verification determine the final production scope.
| Build Variable | Typical Range |
| Conductor Size | 0.14–6.0 mm² standard; larger conductors reviewed by application |
| Finished Length | 0.1–20 m standard; longer assemblies reviewed individually |
| End Configuration | One specified termination at each end |
| Interfaces | Circular connectors, D-sub, RJ45, terminals, terminal blocks and customer-specified interfaces |
| Build Input | Drawing, pinout, cable specification, BOM or approved sample |
Outside these ranges? Send the cable specification, both-end interface details and required tests for review.
04 / FIRST-ARTICLE WORKFLOW
From Drawing to First Article
The first-article workflow confirms the cable specification, both-end interfaces, pin assignment, finished dimensions and verification requirements before repeat production. Open technical points are documented for review, and production proceeds from the approved drawing, BOM and first-article revision.
| Step |
What Is Confirmed |
|---|---|
| 1.Drawing and Sample Review | The latest drawing, cable specification or approved sample is reviewed for finished length, end A and end B interfaces, pin assignment, shield treatment, protection, identification and required verification. |
| 2.DFM Feedback | Engineering identifies missing dimensions, cable-to-terminal compatibility issues, bend-radius risks, shielding conflicts and tooling needs. Any proposed material or construction change is returned for approval before the BOM or drawing is updated. |
| 3.Build Package Confirmation | The drawing, BOM, approved part numbers, tooling needs and verification scope are aligned before the first article is scheduled. Customer-specified parts and approved alternatives are recorded in the controlled build package. |
| 4.First Article & Verification Record | The first article confirms finished length, endpoint orientation, pin assignment, identification and agreed verification requirements. Dimensional, connection or project-specific records are provided when defined in the quotation or purchase specification. |
| 5.Approval & Repeat Production | Repeat production proceeds from the approved drawing, BOM and first-article revision. Later changes are reviewed and documented before work instructions or verification programs are updated. |
05 / PROJECT REVIEW
Ready for a Cable Assembly Review?
| Send the latest drawing, pinout, cable specification or reference sample available. We will review the open technical points before quotation and first-article planning. |
06 / TERMINATION & CONNECTOR FINISHING
Selecting the Right Termination and Connector Construction
The termination method must match the conductor, contact system, connector design and required production controls. Sealing, molded strain relief and cable-to-connector geometry are reviewed separately as part of the connector construction. KABASI flags compatibility and tooling risks during DFM review.
|
Method or Construction |
Typical Fit |
Main advantage |
Key Review Point |
|---|---|---|---|
| Crimping | Repeat production using compatible contacts, conductors and tooling | Repeatable, efficient connections under controlled setup | Contact, conductor size, strip length and applicator must be matched |
| Soldering | Low-volume builds, special contacts or connectors designed for solder termination | Flexible for interfaces without a compatible crimp system | Heat input, solder coverage, insulation clearance and strain relief require control |
| IDC | Ribbon cable and compatible insulation-displacement connector systems | Fast, repeatable multi-conductor termination | Conductor pitch, insulation, cable thickness and connector compatibility must match |
| Screw or Clamp Terminal | Serviceable equipment interfaces and field-accessible connections | Easier replacement and maintenance | Wire preparation, ferrules where required, insertion depth and tightening requirements must be defined |
| Overmolded Connector Construction | Sealed transitions, molded strain relief and defined cable-to-connector geometry after contact termination | Integrated mechanical protection and repeatable external geometry | Internal termination, tooling, resin compatibility, cable adhesion and sample validation must be reviewed |
For an overmolded design, include the connector geometry, cable specification, sealing objective and expected mechanical load in the project review
07 / SHIELD TERMINATION
360° Circumferential Termination vs Pigtail
Shield performance depends on how the braid, foil and drain wire are connected across the cable-to-connector interface. The drawing should define the grounding strategy at each end, taking the cable construction, connector, backshell and equipment bonding concept into account.

360° Circumferential Termination
A 360° termination bonds the cable shield around the connector shell or backshell, creating a short path with low transfer impedance. It is commonly considered where high-frequency shielding and enclosure bonding are required, provided the cable, shield clamp and connector construction support continuous circumferential contact.

Pigtail Termination
A pigtail uses a drain wire or short conductor to connect the shield to a pin, terminal or defined grounding point rather than forming a 360° shell bond. It may suit a specified single-point grounding scheme or a connector without a shield-clamp interface. Pigtail length, routing and termination point must be controlled in the drawing.

Combined and Double-Shield Constructions
For foil-plus-braid cables or separately shielded pairs, the drawing should define how each shield layer is bonded, isolated or connected through a drain wire at each end. The cable construction, connector and backshell compatibility, and the equipment grounding concept must be reviewed together.
Shielding performance and frequency suitability can only be evaluated against the complete cable, connector, backshell, grounding arrangement and test method.
08 / TESTING & RELEASE
Verification Methods and Failure Modes
Verification follows the approved pinout, drawing and project acceptance requirements. Connection and release checks confirm the completed assembly, while pull-force, resistance, network or qualification testing is performed only when the method, sampling plan and acceptance limits are defined.
|
Verification |
When Applied |
What It Detects |
|---|---|---|
| Continuity & Pin Verification | Each completed assembly, if confirmed by the approved release plan | Open circuits, wrong pins and reversed connections |
| Short-Circuit Check | Each completed assembly, if confirmed by the approved release plan | Unintended bridges, stray strands and incorrect connections |
| Shield-Path Verification | When a shield connection is defined between specified endpoints | Broken braid, missing drain-wire connection or incomplete shell bonding |
| Workmanship, Dimensions & Identification | As defined by the approved drawing and release plan | Workmanship defects, incorrect length or orientation, and missing or misplaced labels |
| Crimp Pull-Force Verification | During setup qualification or defined sampling | Insufficient terminal retention, conductor damage or terminal pull-out |
| Low-Resistance Measurement | When the circuit and resistance limit are specified | Excess contact, termination or conductor resistance |
| Insulation Resistance / Hi-Pot | When voltage, duration, leakage limit and safety conditions are specified | Insulation damage, contamination or insufficient electrical separation |
| Network Validation | For compatible data assemblies when the network method and limits are specified | Wiring faults or performance outside the approved network requirement |
Project-specific test records can be linked to the production lot when they are requested and defined at quotation stage.
09 / APPLICATION CONFIGURATIONS
Typical Point-to-Point Cable Assembly Configurations
These examples show how a single cable can connect two defined endpoints in sensor, control and data applications. The final construction is determined by the approved cable, both-end interfaces, pin assignment and operating requirements.
Sensor and Actuator Cable AssembliesSingle-cable assemblies can connect circular sensor or actuator interfaces to controllers, valve plugs, terminal blocks or customer-specified endpoints. Cable flexibility, connector orientation, shielding, sealing and identification are reviewed against the equipment installation. Typical configurations:
|
Control and Data Cable AssembliesPoint-to-point control or data assemblies can combine customer-specified cable with D-sub, RJ45, circular, terminal or mixed interfaces. Pin assignment, shield treatment, backshell construction and required electrical or network verification are defined by the project. Typical configurations:
|
FAQ
Q: Can You Start From An Existing Cable Assembly Sample?
A: Yes. An existing assembly can support the initial review when it is accompanied by the available cable, connector and application information. Before production, the dimensions, pin assignment, materials, identification and acceptance requirements must be documented and approved.
Q: Can You Use Customer-Specified Cable And Connectors?
A: A cable assembly is normally a single point-to-point build between two endpoints. A wire harness combines multiple wires or cables into a branched assembly with several endpoints. Multi-branch projects should use our Custom Wire Harness service.
Q: Can You Provide First-Article And Lot-Linked Verification Records?
A: Yes. First-article or lot-linked records can be provided when the required record type, method, sampling plan, acceptance limits and documentation scope are agreed during quotation.
Q: Can You Match An Existing Connector Orientation And Labeling Layout?
A: Yes, when the required clocking, reference points, label positions and identification rules are defined in the drawing, approved sample or first-article record. These details are confirmed before repeat production.
Q: How Are Changes Handled After First-Article Approval?
A: Changes to the cable, connector, pin assignment, finished length, shielding, protection, identification or verification requirements are reviewed before the drawing, BOM, work instructions or verification program is updated.
Q: How Do You Protect Our Drawings And Project Information?
A: Submitted drawings, BOMs, pinouts, samples and proprietary part information are used only to review and support the requested project. Add any NDA, access-control or file-handling requirements to your inquiry.
11 / PROJECT INQUIRY
Start Your Custom Cable Assembly Project
|
Send the latest drawing, cable specification, pinout, BOM or reference sample available. Include the finished length, end A and end B details, estimated quantity, operating conditions, required verification and target date. We will review the project scope before confirming the quotation and first-article plan. |
Submitted files are used only to review and support the requested project. Add any NDA, access-control or file-handling requirements to your inquiry.





